die模具
figure file, chart file圖檔
cutting die, blanking die沖裁模
progressive die, follow (-on)die
連續模
compound die復合模
punched hole沖孔
panel board鑲塊
to cutedges=side cut=side scrap切邊
to bending折彎
to pull, to stretch拉伸
Line streching, line pulling線拉伸
engraving, to engrave刻印
upsiding down edges翻邊
to stake鉚合
designing, to design設計
design modification設計變化
die block模塊
folded block折彎塊
sliding block滑塊
location pin定位銷
lifting pin頂料銷
die plate, front board模板
padding block墊塊
stepping bar墊條
upper die base上模座
lower die base下模座
upper supporting blank上承板
upper padding plate blank上墊板
spare dies模具備品
spring彈簧
bolt螺栓
document folder文件夾
file folder資料夾
to put file in order整理資料
spare tools location手工備品倉
first count初盤人
first check初盤復棹人
second count復盤人
second check復盤復核人
equipment設備
waste materials廢料
work in progress product在制品
casing = containerazation裝箱
quantity of physical invetory second count復盤點數量
quantity of customs count
會計師盤,點數量
the first page第一聯
filed by accounting department for reference會計部存查
end-user/using unit(department)使用單位
summary of year-end physical inventory bills
年終盤點截止單據匯總表
bill name單據名稱
This sheet and physical inventory list will be sent to accounting
department together (Those of NHK will be sent to financial
department)
本表請與盤點清冊一起送會計部-(NHK廠區送財會部)
Application status records of year-end physical inventory List and
physical inventory card年終盤點卡與清冊使用-狀況明細表
blank and waste sheet NO.
空白與作廢單號
plate電鍍
mold成型
material for engineering mold testing工程試模材料
not included in physical inventory不列入盤點
sample樣品
incoming material to be inspected進貨待驗
description品名
steel/rolled steel鋼材
material statistics sheet
物料統計明細表
meeting minutes會議記錄
meeting type會別
distribution department分發單位
location地點
chairman主席
present members出席人員
subject主題
conclusion結論
decision items決議事項
responsible department負責單位